Steam Locomotive LO806, a 4-8-2, built by North British 1948 and being a former SAR class 19D, rushes to the next loading point at the BCL ore mine at Selibe Phikwe, Botswana. This is a 24/7, 365 days a year, 100% steam operation (if all steam locomotives are available). ? www.tanago.de