The bridge has been designed to the transfer of trams. The place left to the tram track in the middle of the bridge, but the tracks were not laid off. The Reconstruction of the tram 1 and the bridge passage line section were built together. The bridge is planned to deliver by Jan. 2015, but the opening was delayed, because the National Transport Authority. They required one more load test with 1000t and after that they opened the extended tram section.