99热这里只有精品国产动漫,秋霞久久国产精品电影,国产麻豆91在线,97精品国产一二区

RailPictures.Net Photo: CDTX 2109 Amtrak Siemens SC-44 at Fullerton, California by Craig Walker
 
  Login · Sign Up 


  1. Community Response Locomotive Details Location/Date of Photo
    Views: 2,519     Favorited: 4
    Since added on January 11, 2022

    + Add to Favorites

    + Subscribe

    + Add to Photo Album

    + Post a Photo Comment
         
    » Amtrak (more..)
    » Siemens SC-44 (more..)
    » Fullerton Transportation Center 
    » Fullerton, California, USA (more..)
    » January 10, 2022
    Locomotive No./Train ID Photographer
    » CDTX 2109 (more..)
    » AMTK 784 (more..)
    » Craig Walker (more..)
    » Contact Photographer · Photographer Profile 
    Remarks & Notes 
    It was not a great evening for passengers in Fullerton, as a BNSF train (possibly the H-BARLAC) ended up fouling all three mainlines somewhere between Buena Park and Norwalk. This resulted in a number of Amtrak and Metrolink trains being delayed for up to three hours, and even a Metrolink train that was heading to LA unloading its passengers in Buena Park and then reversed and deadheaded to Riverside. Amtrak’s Goleta to San Diego Pacific Surfliner 784, due to arrive at 5:41 pm (18:41), eventually made it to Fullerton, arriving 2 hours 43 minutes late on Track 3 behind CDTX SC-44 2109 at 8:24 pm (20:24) – and then the crew got off as they were in danger of exceeding their hours of service for the day. BNSF train H-WATBAR1-10 (High Priority Merchandise; Watson CA to Barstow CA), behind ET44C4 3681, rolled into the station at the same time, but has finally gotten a clear signal and departs eastbound for its destination in the desert, allowing Amtrak Pacific Surfliner 785, heading from San Diego to Los Angeles and due in Fullerton at 6:21 pm (18:21), to then arrive on Track 1, so that it, too, could change crews. Train 785 departed at 8:52 pm (20:52), 2 hours 31 minutes late, and eventually train 784, also with a fresh crew, got moving again at 8:59 pm (20:59), now 3 hours 18 minutes late. And all of this was holding up Amtrak 3, the eastbound Southwest Chief, making it over three hours late into its first stop on its journey to Chicago – and just 30 miles into its 2000+-mile trip. And there was at least one other delayed Surfliner behind it! (Fullerton, California – January 10, 2022)
    Photo Comments (0) 


     User Photo Albums Containing this Photo (3)+ Add to Album
    CA State Railroads

    Album created by member Ty Kaneshiro
    Album Views: 62,565
    Metrolink, Coaster, etc...
    Nocturnal Nuances: Sunset To Sunrise & All Through The Night!

    Album created by member Dana M.
    Album Views: 750,699
    A continuously growing album of photos that IMHO reveal the awesome and seldom-seen beauty of the railroad world from the dimming of day to dawn's early light! From dusk to dawn, trains roll on! (I'm still finding gems of sunset-to-sunrise surprises!)
    Natural Nights

    Album created by member Isaac Anderson
    Album Views: 20,121
    Night or dark shots taken without flash.
    Add to Photo Album or Get Your Own Photo Album


    EXIF Data for this photo: [What's this?]
    - Hide Data -

      ApertureFNumber  f/3.5
      Make  NIKON CORPORATION
      Model  NIKON D7500
      ExposureTime  8/10
      ISOSpeedRatings  200
      Flash  24
      FocalLength  180/10

    Photo Copyright © 2022 Craig Walker. All Rights Reserved. Photo Usage Policy
    This website Copyright © 2002-2025. All Rights Reserved.
    Do Not Sell My Personal Information
    <code id="mw8y3"><abbr id="mw8y3"></abbr></code>