After a meet with a northbound, CN 3318 is ramping back up to track speed to pull these iron ore loads down to the yard at Two Harbors for stockpile until the shipping season resumes.
The DP from an east loadout at Minntac hits N. Biwabik as it heads south for Two Harbors, MN while a northbound empty sits in the siding giving the roll-by before proceeding.
A trio of standard cab Dash 8's are moving right along as they take control of a train of steaming pellets bound for Two Harbors. The standard cab Dash 8 era on the Iron Range ended not long after... (more)