A T-bird is busy unloading at the Fairlane Plant on the Missabe Sub. 2 trains run back and forth all day, most days, delivering raw iron ore to this plant for production into pellets. The track to... (more)
The T-Bird trains were alittle mix of old and new on our trip this time in 2020. This one had old SD40 and C40 combo, while the other T-Bird had a pair of newer AC-GE's. These trains run from the ... (more)
A pair of DMIR Tunnel Motors and an IC SD40 slowly ease forward as they pull ore cars through the loader at the Fairlane taconite plant in Fairlane, Minnesota for loading with pellets.
An empty ore train out of Duluth pulls into the United Taconite plant at Fairlane for loading. In 2 hours this train will be loaded with ore pellets and will head back to Proctor for furtherance t... (more)