Keeping the railroad useful during the last month of operations with various section work chores - picking up around 40 yards of fill dirt on a drizzly afternoon provided one of the rare last oppo... (more)
One lone Simpson switcher puttered around the Shelton waterfront at Mill 3 on one of the remaining last days before the railroad would become a fallen flag.
Simpson switch job races the PSAP Bangor turn (seemingly) side by side on adjacent track at 6:30 AM. After 125 years in existence the final day comes Monday for this lumber railroad. The mill it ... (more)
Although the 1202 and her sisters are short-timers on their soon-to-be-defunct railroad she still has work to be performed. Here she is being rolled out of the RoHo for a day of work train duty e... (more)