On a beautiful Fall morning, the Milford-Bennington crew passes the small hydro-electric plant in Wilton, NH on their way South with 10 loads of stone in tow. This is the crew's second run of the ... (more)
On a beautiful Fall morning, the Milford-Bennington crew crosses the intersection of Burnt Hills Rd and Mill St heading Southbound with 10 loads of stone in tow. This is the crew's second run of t... (more)
After running around their train at Wilton, NA-1 heads back South, passing the hydro-electric power plant in Wilton, NH. The local is just South of MPI-16 with 2 empties from Hendrix Wire & Cable,... (more)
Back on State-owned track, the MBRR crew throttles up past the Wilton Police Department and over Burns Hills Rd in Wilton, NH. This was the first run of the day and the crew was bringing the empty... (more)
This little RR operation was amazing to watch since there's nothing quite like it around! The SW9 shoves the train, caboose first, up to the quarry, loads the hoppers, and then the locomotive lea... (more)
After receiving permission to occupy the Yard Limits between Wilton and MP-I13 from the Pan Am Railways District 2 Dispatcher, Milford-Bennington continues South. Having been only the second time ... (more)