Restricted to 15MPH, This monster 172 Load, 18422 Tons, 15780 Foot long stack train creeps around Sullivan's Curve. The power is broken up into a 5X3X2 configuration totaling 44000 HP!
The UP F... (more)
A BNSF stack rolls into Bealville, following very closely behind the UP QRVWC, which was at Cliff at the time of the capture. The stack then proceeded to stop and wait for an upgraded signal indic... (more)
The sun begins to set and the days winds begin to calm as a pair of DPU's help ease a westbound grain train down the hill approaching Abo, NM on BNSF's Clovis Sub.