After crossing the ME/HN border, here is the FRA Extra on the SLR crossing the causeway on Reflection Pond with the NH mountains standing tall in the background.
On July 13th, 2020 the FRA inspection train made an appearance on the SLR. Daytime action on the SLR Berlin Sub is extremely rare and this was no exception. SLR 3007 was in the lead as they crosse... (more)
After being held out of Southwark Yard for a short period, the conductor has thrown the switch and SLR 393 is slowly pulling into the yard with SLR 3007, SLR 3008, QGRY 3014, QGRY 6904 for power a... (more)