A power move is in action, as CSXT #7022 heads north off of the A&WP Sub. at Main Street Connection. This engine will be used to transport autoracks of train M210 over the Lineville Subdivision.
Taking a medium approach into the siding at Broughton, a rebuilt MAC slowly brings autoracks to a stop. The process of rebuilding one of these beast takes around 12 weeks from start to finish. Th... (more)
On a quiet dirt road in the rural area of Broughton, a clean and newly rebuilt MAC, heads north through the grade crossing leading an 83 car train that is traveling from Baldwin, FL to Birmingham... (more)