Green Bay & Western train 2 crosses the Wisconsin River at Wisconsin Rapids, Wisconsin, on the afternoon of October 3, 1992. The Badger State is known for its paper production, and a large paper p... (more)
Green Bay & Western train 2 crosses a bridge parallel to a dam on the Black River that forms Lake Arbutus at Hatfield, Wisconsin, on December 5, 1992. The train is pulled by a quartet of GB&W Alco... (more)
Not long after departing East Winona, Green Bay & Western train 2 rambles through Wisconsin farm country at Marshland on the morning of December 5, 1992. The eastbound train is powered by a quarte... (more)
GBW train 2 has finished switching the sand load out at Taylor and is really working hard to get back to track speed as it makes its way east powered by 323,320 and 311.
A pair of RS-27's and a C424 spew some smoke as the make there way across the up and down profile near City Point with 74 cars on train 2 on a cloudy June noon hour.
As the GB&W struggled through the 80's the once perfectly maintained Alcos started to show a noticeable lack of the fine exterior finish they had been noted for. A number of them took on a more pi... (more)
Green Bay and Western train No. 2 is at milepost 178 at Whitehall, Wisconsin, on the pretty autumn day of October 3, 1992. The train is powered by Alco C424s Nos. 314 and 320, and RS27 No. 316.
Merrillan crossroads Green Bay and Western train No 2 cools its heels at Merrillan, Wisconsin for a crew change and some switching. Over at the diamond by the Merrilan depot, a Chicago ... (more)
GBW train 2 normally arrived in Wisconsin Rapids in the early afternoon. It was worked there and then made an evening departure for Green Bay. This shot of train 2 with 316,310 and 115 cars was sh... (more)
GB&W train 2 making it's morning run across western Wisconsin being lead by RS-27 318, and C424's 311, 312 along with 117 cars. Sights like this made the GB&W the place to be for Alco fans in the ... (more)