The Iowa Northern's Oelwein job is heading south towards Waterloo with an ethanol train for the Canadian National at Waterloo, IA. Here they pull at 10 mph thru the sag a few miles south of Fairb... (more)
The Iowa Northern's Oelwein job went to work at 8 am at Waterloo and cabbed to Fairbank to put together an ethanol train for the Canadian National at Waterloo, IA. Here they head south towards Wat... (more)
Iowa Northern's Oelwein job is parked at the ethanol plant at Fairbank. This job originates normally here at Fairbank at noon daily and works between Waterloo and Oelwein. Hawkeye Renewable Energy... (more)
The Conductor on the Oelwein Job has a long cold ride into Waterloo. The Oelwein Job is shoving into Linden Ave before heading north on the CN industrial Lead. Due to the on going room problems at... (more)
The Oelwein Job has just begun their day at Fairbank. They will get 31 cars together for the trip down to Waterloo. Here they are moving some cars for the ethanol plant before digging out more eth... (more)
Vestiges of the Chicago Great Western Mainline to Kansas City. The superelevation in this curve is no longer needed for the 10mph running on what is now a short spur.
Work is done for the day for the Oelwein Job. They brought cars out of Oelwein, Fairbank, and Dunkerton today for the CN and UP. Now the power will layover here at the new siding named Bulter. The... (more)