An interesting gaggle of power doubles and triples it's train together for the last run of the day to Arvida. The Port Alfred Yard engine has been added to the point for the extra tonnage of the f... (more)
With the Port Alfred Yard power on the point, the ARPA Sub local heads back to Arvida with the last train of the day consisting of 42 loads. What a shame that the GMTX leaser was a part of this co... (more)