No train today on the revived LTVSMC mainline in northeastern Minesota, but an interesting view was had of the east end of the 1,800-foot Cramer tunnel, the longest in Minnesota, bored through sol... (more)
The BN is starting to blur into the past, just like the logo on this 36-ft taconite car shown passing the signals at milepost 15.9 en route to Allouez (Superior).